SUCCESS STORIES


LARGE RAILROAD

This job required the remediation of contaminated soil beneath track and rock ballast. Note the TPH decrease over a period of 49 days. Desert conditions required the Integra
Team to use special procedures.

 

AIRCRAFT MANUFACTURER

The following results are from PCB and TPH contaminated soil in Dallas. There is no detectable PCB left in the soil at all.

2air1.gif (47497 bytes)

2air2.gif (55125 bytes)

 

STATE OF NEW YORK

The floor of a New York electrical vault had become highly contaminated with various PCB’s. Even though the contaimination was not treated for the first 38 days impressive results were still possible using Integra products..

2newyork1.gif (73988 bytes)

 

HEAVY CRUDE SPILL

This project took place near Tampico, Mexico. Over several years, spillage from a storage tank, along with general pipe leaks, had led to extremely heavy contamination by thick crude products in the soil. Outstanding results were achieved.

2hvycrude1.gif (66014 bytes)

 

 

CONTACT US I HOME